Dubai, UAE
Biaxial geogrid applied to desert highway soft soil section, 120km total length.
A major highway project in Dubai required soil reinforcement across sandy desert terrain with extreme temperature variations.
Biaxial geogrid 30KN/m was deployed in layered installation with geotextile separation layers.
Completed in 18 months. Zero subsidence reported after 2 years of operation.